网站首页
词典首页
请输入您要查询的英文单词或汉字:
词汇
把一些工程转包给另两个公司
释义
把一些工程转包给另两个公司
subcontract some of the works to the other two firms转包
随便看
The bomb exploded while it was still in the air
The bomb failed to detonate
The bomb failed to explode
the bombing
the bombing of shortcomings
The bombing raid practically leveled the town
The bomb reduced the houses to rubble
the bombs
The bombs all fell within the target area
The bombs boomed
The bombs came raining down
The bombs demolished the factories
The bombs rased the building to the ground
The bombs razed the building to the ground
The bomb was Captain Speedy
The bomb was exploded by remote control
The bomb went off at6: 30 this morning
The bomb went off in a crowded street
The bomb went off suddenly
The bomb went off with a deafening crash
the bona fide possession
the Bonan sub-Sag
the Bonan Sub-Sag
The bonanza is intentional
The Bo Nationality
英汉汉英双解词典包含9999994条英汉翻译词条,涵盖了常用英语单词及词组短语的翻译及用法,是英语学习的必备工具。
Copyright © 2000-2024 tbdmj.com All Rights Reserved
更新时间:2024/12/23 6:30:29