time limit for a projecttaimˈlimitfɔ:əprəˈdʒekt短语¹⁴⁴⁹⁷²⁺² 基本例句 工期 In this pater, the problem of limited resources and shortest time limit for a project is studied and an algorithm of branch and bound method for this problem is proposed. 本文研究了资源有限—工期最短的优化问题,提出了相应的分枝定界算法。 cnki