网站首页  词典首页

请输入您要查询的英文单词或汉字:

 

词汇 qinshan
释义 qinshanBNC²³⁶²¹³⁺¹
基本例句
🌏评论
EDF has provided and transferred design, construction and operation management skills for the nuclear projects in Daya Bay, Lingao, Qinshan and Tianwan;
为大亚湾、岭澳、秦山和田湾等核电项目提供并无保留转让设计、建设及运营管理技术; chitec

In combination with the 2nd phase of Qinshan NPP, the countermeasure which should be adopted is inquired according to the developing tendency mentioned above.
结合我国秦山二期工程的具体情况,探讨了我们应该采取的对策。 cnki

It describes the visual inspection generator of steam con in Daya Bay and Qinshan INPPbefore cleaning and after cleaning.
介绍了大亚湾和秦山一期核电站蒸汽发生器清洗前、后的目视检查。 dictall

The preliminary results of the code on the optimal design for low- leakage fuel management of Qinshan NPP refuelling core are also evaluated briefly.
简要评述了该程序在秦山核电厂再装载堆芯低泄漏燃料管理优化设计中的初步应用情况。 cnki

The reactor physical simulating test on the principle simula-for of Qinshan NPP is described in detail in this paper.
本文详细介绍了在秦山核电厂原理模拟器上进行的反应堆物理模拟试验。 cnki

At present, Qinshan Nuclear Power Plant will be in full power, the normal operation of the system is satisfied with the demand of safe operation in Qinshan Nuclear Power Company.
目前,秦山核电站正向满功率进军,核空气净化系统运行正常,满足了秦山核电厂安全运行的要求。 cnki

Finally, the long-term programme on the Qinshan nuclear power engineering is simplydiscribed, too.
最后对秦山工程的远期规划也作了简单介绍。 cnki

In order to analyze the characteristics of load rejection for turbine generator of Qinshan Phase II NPP Project, a dynamic model based on module modeling method is developed.
采用模块化建模方法建立了核电站二回路的动态模型,并完成了秦山核电二期汽轮机甩负荷特性的分析。 cnki

Influence factors and quality descriptors are formed by the interview with operators in Qinshan Nuclear Power Plant and HDT analysis performed for SGTR and SLOCA based on this information.
结合秦山二期核电厂的人员可靠性现场访谈形成影响因子和品质等级描述,并以 SLOCA和 SGTR为例进行全局决策树方法分析。 dictall

Objective:To set up a database of residents' health status in range of20 kilometers around the Qinshan nuclear power station.
目的:建立秦山核电厂周围20公里范围内居民健康状况数据库。 cnki

Seismic analysis and testing are carried out in accordance with the IEEE344-1987 standard for the emergency generator set EDG set in Qinshan Nuclear Power Plant.
参照 IEEE344-1987的规范要求,对秦山核电厂应急柴油发电机组简称EDG机组进行抗震分析和试验研究。 cnki

Since its foundation, Song Ting has cooperated with Shanghai Bao Steel, Qinshan Nuclear Power Plant, large-scaled enterprises in the production of whole- set control equipments.
自建厂以来先后为上海宝山钢铁总厂、秦山核电站等大中型企业制造成套电器仪表控制装置。 www.songting.com.cn

Some typical characteristics of Qinshan II650MW nuclear steam turbine during installation were presented and special measures and major problems as well as their management results were introduced.
阐述讨论了秦山二期650MW核电汽轮机在安装过程中的若干典型特点、所采取的特殊措施,以及遇到的主要问题和处理结果。 dictall

Structural and mechanical design are performed according to the requirement on the overall design and design input for the reactor pressure vessel support of Qinshan Phase II NPP Project.
根据总体设计要求和设计输入要求,进行了秦山核电二期工程反应堆压力容器支承的结构设计和力学设计。 cnki

The article introduces the experiment procedure and usage of non dispersible underwater concrete in China Qinshan Nuclear Power Plant.
本文介绍了水下不分散混凝土在秦山核电站三期海上取水口稳管工程中的应用情况。 cnki

The feasibility and economy of the application of reprocessed uranium RU from spent PWR fuel in CANDU reactor of Qinshan Phase III NPP were studied.
对压水堆乏燃料后处理回收铀 RU在秦山三期 CANDU堆中应用的可行性和经济性进行分析。 iciba

The initial core loading program, nuclear safety and nuclear monitoring during the core loading and temporary instrumentation system for Qinshan NPP is described.
本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。 cnki

This article introduces the in-core fuel management strategy improvement of Qinshan Nuclear Power Plant in its10- year operation.
本文介绍了秦山核电厂10年来的堆芯燃料管理改进情况。 cnki

This paper research the response if the accident occurred in Qinshan nuclear power unit, discusses the better method and key point to handle the accident.
同时,进一步探索了秦山核电厂发生此类事故时的电厂响应;处理此类事故的较好方法以及事故处理过程中的关键点。 cnki

This Paper describes the components of nuclear air- cleaning system, system function, operational mode and the performance of cleaning components in Qinshan Nuclear Power Plant.
本文介绍了秦山核电厂核空气净化系统的设置,系统功能及运行方式,净化部件的性能参数。 cnki

This paper describes the contents, method and results of the Qinshan NPP reactor: coolant pump cold commissioning.
文中介绍了秦山核电厂反应堆主冷却泵冷态调试的内容及试验方法。 cnki

This paper describes the significance of PRA in nuclear power plant safe-ty decision and the work of PRA of Qinshan Nuclear Power Plant proceeding by shanghai Nuclear Research and Design Institute.
本文介绍了上海核工程研究设计院开展秦山核电厂 PRA工作的情况,以及 PRA在该电站安全决策中的意义。 cnki

This paper introduces a test mather d, data treatment and test result of coast down flow rate test following reactor coolant pumps trip in Qinshan NPP.
本文介绍了秦山核电厂主冷却剂泵停止后,一回路惰走流量的测试方法、数据处理及测试结果。 cnki

This paper simply presents the bases of design, design requirement and experimental investigation of Qinshan nuclear power plant's control rod drive li-ne.
本文简要介绍秦山核电厂控制棒驱动线的设计依据、设计要求以及试验研究。 cnki

This paper summaries the I& C designs and the development of the key instrumentation for the reactor and coolant system of Qinshan Phase II NPP.
本文总结了秦山核电二期工程反应堆及反应堆冷却剂系统仪表和控制的设计、重要仪表控制设备的研制。 cnki

With computer technology, the in-core instrumentation system of Qinshan phase II nuclear power plant can automatically perform parameter acquisition, data process and information display.
秦山核电二期工程堆芯测量系统采用计算机技术实现了对相关数据的自动采集、数据处理和信息显示。 cnki

Qinshan nuclear power plant is the first nuclear power plant in China, it is very important for the nuclear power development in China.
秦山核电厂是我国自主建造的第一座核电厂,它对我国核电事业的发展有着重要的作用。 dictall
随便看

 

英汉汉英双解词典包含9999994条英汉翻译词条,涵盖了常用英语单词及词组短语的翻译及用法,是英语学习的必备工具。

 

Copyright © 2000-2024 tbdmj.com All Rights Reserved 更新时间:2025/3/27 11:30:57