释义 |
power house短语⁸⁴³²⁰⁺⁸ 基本英英例句 n.动力室发电厂;影响的源泉
名词 powerhouse: a highly energetic and indefatigable persona team considered to be the best of its classan electrical generating station Some conclusions assumed from the research and design of Jiangkou power house is quite useful for all the underground Hydropower Station. 本文的观点和结论对地下厂房工程设计有着一定的普遍意义。 cnki The hoisting forms for tailrace sluice gate of the power house of hydropower station are various. 水电站厂房尾水闸门吊装就位的形式多种多样。 dictall The layout of underground power house of Baise project is limited by the special geologic condition. 百色水利枢纽地下厂房布置受地质条件的限制性较强。 cnki The stability calculation of power house, selection of unit type and layout of pumping station are carried out based on the hydrological datum and geological conditions. 根据水文资料和地质情况,进行泵站枢纽布置设计、选择机型、计算厂房稳定等。 cnki With the influence of so many cracks, the strength, stiffness and stability of the umbrella arch is decreased greatly, which endangers the operation of underground power house. 数目众多的纵、横向裂缝已大大削弱了混凝土顶拱的强度、刚度及稳定性,危及地下厂房的安全运行。 cnki Based on the discontinuous deformation analysis DDA, the stability of the high rock slope behind the power house of Jiudianxia hydroelectric station was studied. 应用非连续变形分析 DDA对九甸峡水电站厂房高岩体高边坡进行了稳定性分析研究,建立了 DDA块体系统分析模型。 dictall Finally, the selection of underground power house axis and the lining design scheme for the pressure tunnel are discussed based on the in- situ stress. 最后从地应力角度,讨论地下厂房的轴线选择和高压隧洞衬砌设计方案。 rockmech How to solve the problems of the safety and stability of the surrounding rock is a difficult point for the design and construction of Longtan Underground Power House. 如何解决好围岩的安全稳定是龙滩地下厂房设计和施工的难点问题。 cnki Locating the power house is one of the most important problems for the project not only in the conditions for construction but also in economic cost. 厂房位置的选取不论是在施工条件上,还是经济造价上,都是该工程最重要的问题之一。 cnki The main power house structure in the thermal power plants is a system dealt with many and strong specialties and has close relation with development of the construction technology. 火电厂主厂房结构是一个涉及面广、专业性强的体系,它与施工技术的发展密切相关。 cnki The numerical study shows that the weak position is not located at the middle of the powerhouse, but at the part with certain distance to one end of the power house. 对泰安抽水蓄能电站地下洞群围岩稳定性进行了三维有限元数值模拟研究,结果表明:围岩最薄弱部位有时可能在距洞端一定距离上;202.127.156.16 This paper introduces briefly the layout of the power house and the main structure design condition of the main power house under the circumstances of construction, operation and cross application. 概述了天湖水电站的厂房布置及主厂房在施工、运行交叉应用工况下的主要结构设计情况。 cnki With the block theory and orthogonal design method, the type and geometrical characteristics and stability of random key block in underground power house of the Three Gorges project are analysed. 应用块体理论、正交设计方法对三峡地下厂房围岩中裂隙可能构成的随机块体类型、几何特征与稳定进行了分析。 cnki |