| 释义 | c/o 英ˌsiː'əʊ美'oʊ ★☆☆☆☆高COCA³⁶⁷⁰³BNC²⁶⁰³⁹ 基本例句
 转交
 And the standard of high precision C/O ratio energy spectrum interpretation is received.
 建立了高精度碳氧比能谱精细解释标准。 cnki
 The stability of neutron yield is an important characteristic index of a C/O tool for ensuring its logging quality.
 中子产额稳定性是保证碳氧比能谱测井质量的仪器重要指标之一。 cnki
 There was no grain of ferronickel generated when C/O ratio was relatively low and the grain size of ferronickel was too small when C/O ratio was relatively high.
 球团配碳比偏低,还原产品无镍铁颗粒生成;球团配碳比偏高,生成的镍铁颗粒粒径过小。 bgrimm
 Because of an active waterflood program with fresh injection fluids from non- reservoir sources, results from C/O logging are the main source for saturation monitoring.
 由于在开采过程中主动从非油区注入淡水,使碳氧比测井成为饱和度监测的主要方法。 agoil
 By combining C/O data obtained from the area, the residual oil distribution and got satisfactory results have been acquired.
 因此,碳氧比能谱测井与多井解释结合有希望确定剩余油饱和度及分布。 emuch.net
 Described are uses of C/O spectrometry log and injection-production profile log in Fuyu Oilfield.
 阐述了碳氧比能谱测井、注入和产出剖面测井技术在扶余油田的矿场应用情况。 chemyq
 For Gudao oilfield fiber glass casing wells, induction logging and C/O logging methods are used regularlyonce half a year to monitor reservoir resistivities and saturation changes.
 以孤岛油田的玻璃钢套管井为例,采用感应与 C/O测井进行定期测井期限一般为半年,进行储层电阻率以及饱和度的监测。 cnki
 In addition, one well with only shut-in data has been evaluated with both C/O and deeper reading induction resistivity.
 另外仅有关井数据的井又用碳氧比和深感应电阻率结合进行评估。 agoil
 In this study we evaluate whether shallow-reading C/O measurements provide the correct formation saturation to evaluate sweep in wells which have been shut-in over a longer period of time.
 在这一方面的研究,我们通过碳氧比测井能否提供准确的地层流体饱和度来估计关井很长时间后井内的波及范围。 agoil
 It was not favorable for metal phase agglomeration and growth when C/O ratio was too high or too low.
 球团配碳比偏低或偏高都不利于镍铁颗粒的团聚长大。 bgrimm
 The article introduces the application of high precision C/O logging technology to thick oil development in Shuguang oil field.
 介绍高精度 C/O测井技术在曙光油田稠油开发中的应用情况。 dictall
 To date, it is common to acquire C/O data in both flowing and shut-in conditions.
 至今,在流动的条件和关井条件下均获得碳氧比数据已经是一种普遍现象。 agoil
 When a borehole is full of water, C/O values decrease with increasing borehole diameter or case size.
 当井内流体为水时,井径或套管直径的增大, C O值减小; cnki
 During C/O processing, the perforated interval is being treated as fully cemented casing.
 在碳氧比测井工程中,射孔间距全部按照水泥套管来对待。 agoil
 |